Sat 28 Nov 2026 17:58
Log in
Hellfire Pass
Kanchanaburi · Tha Sao, Sai Yok200 m7 photosAttraction / museumOpen daily (with closed days)

The Death Railway · Hellfire Pass

Hellfire Pass

Hellfire Pass in Sai Yok, Kanchanaburi, is the rock cutting POWs hacked out by hand in 1943 on the Death Railway, with an Australian Government museum and memorial trail. Free, open 09:00–16:00, with an Anzac Day dawn service on 25 April.

Live today · Saturday 28 Nov17:58
9out of 10
Good to go
Based on the rest of today

Holiday / event — crowded

8Morning
9Late morning
9Afternoon
9Evening
Sunrise 06:31
Thick morning fog with visibility under 1 km — use headlights and drive slowly
Holiday — traffic on the way up and parking fills fast; leave early
Good forHistory, an easy hike
Best timeNov–Feb
AdmissionFree
From townAbout 80–100 km
Time needed1.5–3 hours
Travel from Kanchanaburi townJust over 1 hour from town
Best timeNov – Feb
Before visiting

Opening hours, entry fee and time needed

Opening hours

09:00–16:00 (audio guides until 15:00)

Admission

Free

Time needed

1.5–3 hours

Busy times

25 Apr and late morning tours

Don’t-miss highlights

The cutting01
The cutting75 m long, up to 25 m deep
Memorial trail02
Memorial trail500 m to 2.6 km
Anzac Day03
Anzac DayDawn service 25 Apr
Before you go

7 days ahead
When to go

7/7good days
this week
Safety today · nothing to watch out for
Severe weatherNoneEarthquakesNone in 48 hMajor disastersNoneSite noticesNone

Tap a day card to see that day’s weather, rain, haze and hourly forecast

Daily detailsSaturday 28 Nov
Good to go · 9/10

Best time to go Daytime is over · see tomorrow

By time of day
Morning 05–098
Late morning 09–129
Afternoon 12–169
Evening 16–199

Thick morning fog with visibility under 1 km — use headlights and drive slowly

Holiday — traffic on the way up and parking fills fast; leave early

Sky and view
Clear sky / good views3/10
Visibility16 km
Cloud cover93%
Rain and storms
Rain chance2%
Daytime rain (6am–8pm)0 mm
Humidity68%
LightningNo signal
Body and air
Feels like33°C
UV index7
Gusts~37 km/h
PM2.5 dust5 µg/m³
Time and crowds
Sunrise06:31
Sunset17:53
CrowdsBusy (weekend)

Hour by hour

TemperatureRain chanceScored hours
Sunrise 06:31Sunset 17:5306:00 Rain 0%07:00 Rain 0%08:00 Rain 0%09:00 Rain 0%10:00 Rain 0%11:00 Rain 1%12:00 Rain 2%13:00 Rain 2%14:00 Rain 2%15:00 Rain 1%16:00 Rain 0%17:00 Rain 0%18:00 Rain 0%19:00 Rain 0%20:00 Rain 0%22°0622°0725°0827°0928°1029°1130°1230°1330°1430°1529°1628°1726°1825°1925°20
TimeTemperatureRain chance
22°0%
22°0%
25°0%
27°0%
28°0%
29°1%
30°2%
30°2%
30°2%
30°1%
29°0%
28°0%
26°0%
25°0%
25°0%

Green band = hours used for the score

Get to know

Hellfire Pass

Hellfire Pass Interpretive Centre, 207 Moo 11, Tha Sao, Sai Yok, Kanchanaburi.

A day here, hour by hour
  1. Opening, cool
  2. Hot, tour groups
  3. Last audio guides

Arrive 15:00

Best photo spots
  • Cutting wallsMemorial and flagsMorning
  • Drill marksTraces of the workMorning
  • Centre terraceKhwae Noi valleyAfternoon

Before you go

Good to know here

Steps to the cutting

Steep, gravel

Closed days

1 Jan, 13–15 Apr, first 3 weeks of May, 5 Dec, 24–27 Dec and 31 Dec

Packing checklist
Tips from visitors
  1. Arrive at 09:00 opening
  2. Bring water, a hat and repellent
  3. Borrow a Thai or English audio guide
Admission

Free · Time needed 1.5–3 hours

When is it crowded

25 Apr and late morning tours

Estimated costs
Audio guide, radio, golf buggyFree

Prices may change by season — check with the venue

Who it suits
  • Kids Yes; short trail, mind the steps
  • Seniors Yes; free golf buggy
  • Wheelchair Centre accessible; trail not — use the buggy
  • Pets Allowed on a leash
Where to eat
  • Vending machines at the centreDrinks, snacks
  • Hill Coffee & RestaurantHighway 323, 06:00–21:00
Etiquette here
  • Speak quietly, dress respectfully
  • Don't move poppies or flags
  • No smoking on the trail
More cautions
  • Steep steps
  • Heat
  • Snakes and wildlife
Special times / festivals

Anzac Day dawn service 25 Apr, about 05:30

Emergency numbers
Best times

Best months

Tap a month on the wheel to see weather, rain, haze and crowds from 10 years of records

JanFebMarAprMayJunJulAugSepOctNovDec
NovemberGreatWarm 21–29°C
RainModerate
HazeGood
CrowdsModerate
StatusGreat
Cool

Best time · Nov–Feb cool · 25 Apr Anzac Day service

Watch out · First three weeks of May closed · April very hot

Actual weather records 2016–2025
Rainfall (mm)Clear days
JanuaryTemperature19–30°CAvg rain15 mmRainy days3 daysClear14 daysPM2.516 · Moderate30°
19°
Jan
FebruaryTemperature20–33°CAvg rain26 mmRainy days5 daysClear17 daysPM2.520 · Moderate33°
20°
Feb
MarchTemperature22–35°CAvg rain45 mmRainy days7 daysClear14 daysPM2.522 · Moderate35°
22°
Mar
AprilTemperature23–36°CAvg rain98 mmRainy days13 daysClear10 daysPM2.518 · Moderate36°
23°
Apr
MayTemperature24–33°CAvg rain218 mmRainy days23 daysClear2 daysPM2.58 · Great33°
24°
May
JuneTemperature23–30°CAvg rain241 mmRainy days26 daysClear0 daysPM2.53 · Great30°
23°
Jun
JulyTemperature23–29°CAvg rain311 mmRainy days29 daysClear0 daysPM2.52 · Great29°
23°
Jul
AugustTemperature23–29°CAvg rain312 mmRainy days29 daysClear0 daysPM2.52 · Great29°
23°
Aug
SeptemberTemperature23–29°CAvg rain335 mmRainy days28 daysClear0 daysPM2.53 · Great29°
23°
Sep
OctoberTemperature22–30°CAvg rain279 mmRainy days24 daysClear2 daysPM2.58 · Great30°
22°
Oct
NovemberTemperature21–29°CAvg rain65 mmRainy days11 daysClear6 daysPM2.510 · Great29°
21°
Nov
DecemberTemperature19–29°CAvg rain11 mmRainy days3 daysClear13 daysPM2.510 · Great29°
19°
Dec

Nov by the records 21–29°C · avg rain 65 mm (11 rainy days) · clear 6 days · avg PM2.5 10

Stories and history

The story of this place

Hellfire Pass, known in Thai as Chong Khao Khat and also called Konyu Cutting, is a rock cutting that Allied prisoners of war and Asian labourers carved through a mountainside by hand to carry the Thailand–Burma Railway that Japan built during the Second World War. The main work took place between April and August 1943. It was the deepest and longest cutting on the line and one of its harshest work sites. Today it is a memorial on land of the Royal Thai Armed Forces Development Command in Tha Sao, Sai Yok District, Kanchanaburi, with an interpretive centre and memorial walking trail run by Australia's Department of Veterans' Affairs, and a dawn Anzac Day service every 25 April.

Read more 11 more paragraphs

Before the war, the British colonial government had considered a railway across the Tenasserim Hills but judged it too difficult and costly. After occupying Burma and finding sea transport too risky, Japan decided in June 1942 to build the line, about 415 km from Nong Pladuk to Thanbyuzayat. Construction began in October 1942 with more than 60,000 Allied prisoners, about 13,000 of them Australian, and around 200,000 Asian labourers known as romusha.

The pass lies about 150 km from Nong Pladuk, in the Konyu–Hintok hills above the Khwae Noi valley. The rock is semi-marbleised limestone with quartz. The cutting has two sections: the first about 450 m long and 7 m deep, the main one about 75 m long and up to 25 m deep.

Work on the Konyu section began in November 1942 with about 1,500 British and 2,000 Tamil workers. Early in 1943 many labour camps sprang up in the area, and on 25 April 1943, Anzac Day, about 400 Australians of T Battalion, D Force, began cutting the pass. They had to build their own camp, Konyu 3, beside what is now Highway 323. Nearby Malay Hamlet camp housed prisoners of H Force.

The tools were mostly 8 lb hammers, steel drills, crowbars, picks, shovels and explosives; an air compressor and jackhammers were used only briefly. Waste rock was carried out by hand in cane baskets and rice sacks slung on poles. Drill marks can still be seen on the rock walls today.

When the work fell behind schedule in June 1943, the Japanese sent about 600 more prisoners and some 1,000 Asian labourers, and raised the drilling quota from about 1 m to 2–3 m per man per day. During this rush, known as the "Speedo", prisoners worked 12–18-hour shifts with no rest days. Some sources date the Speedo from April, others to July–August. The cutting was finished around mid-August 1943.

The name Hellfire Pass came from the night shifts worked by the light of oil lamps and bamboo fires: the flickering shadows of emaciated prisoners and guards on the rock walls looked like a living image of hell.

The human cost was terrible. Already weakened by disease, hunger and overwork, the men were hit by cholera in nearby camps in June 1943; by mid-June only about 60 of the 600 men at Konyu were fit to work. The Australian War Memorial records that at least 700 Allied prisoners died on the Konyu section, 69 of them beaten to death by Japanese engineers or Korean guards. For the whole line, the Allied War Graves Registration Unit concluded in 1946 that about 12,500 prisoners had died, along with tens of thousands of Asian labourers; some sources estimate around 102,000 deaths in total.

Further along the old railway lie other notable sites, including the site of the Three-Tier Bridge, the "Pack of Cards" Bridge, which collapsed three times during construction, and Compressor Cutting about 4 km away. The two halves of the railway met at Konkuita on 17 October 1943 (some sources say 16 October), and the line ran until mid-1945 despite Allied bombing. After the war this section was dismantled, and Hellfire Pass was swallowed by jungle for decades.

In the 1980s, former Australian prisoners returned and found the overgrown cutting. In 1983 ex-POW Tom Morris committed himself to turning it into a memorial; the Australian–Thai Chamber of Commerce formed a committee, Thailand's Ministry of Foreign Affairs gave permission in March 1985, and the Australian government funded a survey of the old line that year. Volunteers cleared the jungle and built steps down from the road. On 25 April 1987 the pass was dedicated as a memorial, Sir Edward "Weary" Dunlop, a surgeon and former POW, unveiled a plaque, and the first Anzac Day service was held here.

The memorial grew over the following decade. A monument with a time capsule was dedicated in February 1992. On Anzac Day 1994 part of the ashes of Dunlop, who had died the year before, was interred at the pass, and the visiting Australian prime minister committed to building a museum. From May 1995 to April 1996 about 4.5 km of the old railway was cleared as the memorial walking trail. The building went up in 1997–98, and Prime Minister John Howard opened the Hellfire Pass Memorial Museum on 24 April 1998 (some sources say 25 April).

A black stone memorial was placed at the start of the trail in 2005. The interpretive centre was extensively refurbished and reopened on 12 December 2018. It closed during COVID-19 from March 2020 and reopened on 25 September 2020. More than 166,000 people visited in 2025, and 1,041 attended the 2026 Anzac Day dawn service.

  1. 1942November: British and Tamil workers begin work on the Konyu section of the railway
  2. 194325 April: about 400 Australian POWs begin cutting Hellfire Pass
  3. 1943June: work falls behind; more prisoners sent in as cholera hits nearby camps
  4. 1943July–August: the "Speedo" rush, with 12–18-hour shifts
  5. 1943Mid-August: the cutting is completed
  6. 194317 October: the Thailand–Burma Railway is joined end to end
  7. 1983Ex-POW Tom Morris commits to developing the pass as a memorial
See 11 events
  1. 1985Thailand permits a memorial; the old railway route is surveyed
  2. 198725 April: the pass is dedicated and the first Anzac Day service is held here
  3. 1992February: a monument with a time capsule is dedicated
  4. 199425 April: part of Sir Edward "Weary" Dunlop's ashes is interred at the pass
  5. 1995–1996About 4.5 km of old railway cleared; the memorial walking trail opens in April 1996
  6. 199824 April: the Hellfire Pass Memorial Museum opens
  7. 2005A black stone memorial is placed at the start of the trail
  8. 201812 December: the refurbished interpretive centre reopens
  9. 2020Closed for COVID-19, reopening on 25 September
  10. 2025More than 166,000 visitors
  11. 20261,041 people attend the Anzac Day dawn service
The path down to the cutting
The path down to the cuttingPhoto: ekeidar / Wikimedia Commons (CC BY-SA 3.0)
The rock cutting
The rock cuttingPhoto: BrokenSphere / Wikimedia Commons (CC BY-SA 3.0)
Surviving rails
Surviving railsPhoto: BrokenSphere / Wikimedia Commons (CC BY-SA 3.0)
The trail through the pass
The trail through the passPhoto: ekeidar / Wikimedia Commons (CC BY-SA 3.0)
A memorial tablet
A memorial tabletPhoto: BrokenSphere / Wikimedia Commons (CC BY 3.0)
Travellers who came

Check-ins & visitor photos

Arrived? Check in, collect a stamp and tell others what it is like right now

0 people have checked in here
    Log in to check in

    Location must be on and within 1 km · One check-in per place per day · come back on other days to check in again

    Log in to post photos
    Getting there

    How to get there

    Paved highway

    Open in Google Maps
    CarAbout 1 h

    Highway 323 · Fuel

    BusStop at the centre

    Kanchanaburi–Thong Pha Phum/Sangkhla · Fare

    Road

    Highway 323

    Parking

    Three free car parks

    Fuel

    Highway 323

    Mobile signal

    Fair

    Opening hours

    09:00–16:00 (audio guides until 15:00)

    Distance

    about 80 km from Kanchanaburi town

    Search Google Maps by name

    Hellfire Pass Interpretive Centre

    FAQ

    FAQ
    Before you go: Hellfire Pass

    Answers travellers want before they go — a one-minute read

    01

    Is it free?

    Yes

    02

    Hours and closed days?

    09:00–16:00; closed 1 Jan, 13–15 Apr, first 3 weeks of May, 5 Dec, 24–27 Dec and 31 Dec

    03

    How long is the walk?

    Short trail 40–60 min; long trail about 3 h return

    04

    Why 'Hellfire Pass'?

    Night work by firelight looked like hell

    05

    Is there an audio guide?

    Yes, free, in Thai, English and Dutch

    06

    When is the Anzac service?

    About 05:30 on 25 April

    Hellfire Pass

    Ready to go to Hellfire Pass?

    Best day this week: Monday 30 Nov · Check in when you arrive to collect a stamp

    Check inDirections